In our 2018 report, we highlighted the differentiation strategies that flexible workspace operators were implementing because of the growing competition fueled by the entry of large international players. A year thereafter, the sector faces a new threat that continues today: the Coronavirus Disease 2019 (COVID-19).
The pandemic has undoubtedly brought chaos not only to our health and well-being, but also to the global economy, ravaging through various industries and sectors, no matter how big or small.
The property market was not spared.
In this report, we would like to focus on how over a year into the pandemic has affected the flexible workspace sector, specifically serviced offices and co-working spaces, and how players in the Philippines have adapted in order to survive this undeniably devastating situation.
Flexible Workspace Report 2021
21/05/2021
Related Insights
Article
Cushman & Wakefield Comments for URA Flash Estimates 2Q2024
Based on URA flash estimates, Singapore private home prices continue to rise, up by 1.1% qoq in Q1 2024, despite slowing volumes.
Xian Yang Wong • 01/07/2024
![APAC Inclusive Cities Barometer](https://cw-gbl-gws-prod.azureedge.net/-/media/cw/apac/common/campaign-images/2024/inclusive-cities/apac-inclusive-cities-card.jpg?rev=db1e9058abab4f44965fe4dfe4530d61)
Insights • Sustainability / ESG
Singapore stands out as a top performer in the Inclusive Cities Barometer, renowned for its exceptional urban planning, safety, and cultural diversity.
Dominic Brown • 10/06/2024
![Data-Center-Update_APAC_web-card-1221](https://cw-gbl-gws-prod.azureedge.net/-/media/cw/apac/singapore/insights/2021/data-center-update_apac_web-card-1221.jpg?rev=5b5998337cd343cbb5dcacde426186a8)
Research
The operational capacity of Asia Pacific’s* data centre markets has surpassed the 10GW mark, with ~800MW of new supply added in H2 2023 bringing the total regional live capacity up to 10.6GW. We continue to witness a robust development pipeline with 3.9GW under construction throughout the region and 9.4GW in planning stages, which is an increase of ~900MW since our last update.
Vivek Dahiya • 15/02/2024