Available in Future
DESIGN BUILD AI DATA CENTER POWERED SHELL
175 Boychuk Drive/Phase I, Cambridge, ON N0B Canada
Espace disponible
160,000 SF
Surperficie du bâtiment / superficie
160,000 SF
Année de construction
2027
Sous-location
No
Espace disponible
160,000 SF
Surperficie du bâtiment / superficie
160,000 SF
Année de construction
2027
OVERVIEW
Proposed State-of-The-Art Data Center In Cambridge delivering Q1 2027. Building sf (one Storey), 160K sf (Two Storey) PHASE I of High Density Data Center Campus Premier site for data center operations with close proximity to Toronto – boasting the highest quality tech work force in Canada with a global reputation in engineering, computer science and cyber security
Details
- Espace disponible:
- 160,000 SF
- Prix de location:
- Negotiable
- Type de taux:
- Net
- Surperficie du bâtiment / superficie:
- 160,000 SF
- Année de construction Année de construction:
- 2027
- Sous-location:
- No
- Contïgue maximum:
- 80,000 SF
- Min Divisible:
- 160,000 SF
Voir plus