Stories
Norden Shipping
01 The Opportunity
02 The Solution
Key Success Factors:
End-to-End Responsibility
Full accountability for project execution, encompassing design, planning, and delivery stages.
Integrated Workshop Approach
Simultaneous execution of technical requirement-gathering workshops and design workshops ensured efficient alignment between project requirements and client expectations.
Budgetary Control and Monitoring
Close oversight of budgetary constraints ensured cost efficiency without compromising the project’s quality and timeline.
03 The Result
Key Highlights of the Project:
Timber Flooring Installation:
Major installation of timber flooring was completed with precise consideration for expansion joints and terminations at various locations to ensure durability.
Future-Proof Design Planning:
Extensive design planning was conducted to future-proof work areas, accommodating headcount growth effectively.
Value Engineering Exercise:
A comprehensive value engineering initiative achieved a 35% cost reduction while maintaining core design objectives.